Skip to product information
1 of 8

Vesgantti

Vesgantti 159" Large Modular Sectional Sofa, L-Shaped Corduroy Cloud Couch

Vesgantti 159" Large Modular Sectional Sofa, L-Shaped Corduroy Cloud Couch

Regular price $1,486.62 USD
Regular price Sale price $1,486.62 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

Focused on lasting comfort, the Vesgantti 159" Large Modular Sectional Sofa, L-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with Movable Ottoman, No Assembly Needed, Grey uses breathable construction to support bedrooms. measuring 79.6"D x 159"W x 32.3"H, weighing 1500 Pounds, available in 159" - 4 Seater + Ottoman Grey. Notable features include modular sectional and sectional flexible, contributing to its stylish character.

Key Features

  • Modular Sectional, Flexible Layout: This oversized modular sectional offers ultimate flexibility for your living space. Arrange it as a 2-seat loveseat, 3-seat L-shaped sofa, or 4-seat L/U-shaped sectional. Use modules separately or convert into a sofa bed. Perfect for versatile, stylish, and functional seating in any room
  • Oversized Deep Seat Comfort: Experience cloud-like comfort with extra-deep seats. Perfect for lounging, stretching, or relaxing, this sectional provides ample room for family movie nights, weekend lounging, or entertaining guests in spacious comfort
  • Supportive Spring & Foam Design: Built with high-density foam and reinforced sinuous springs, this sectional provides soft yet balanced support for all body types. Long-lasting durability and excellent rebound prevent sagging over time, ensuring a luxurious seating experience
  • Soft & Durable Corduroy Fabric: Upholstered in premium corduroy, this boneless sectional is soft, breathable, and gentle on skin. Wear-resistant and easy to maintain, it’s pet-friendly and ideal for homes with kids, combining comfort with modern style
  • Convertible with Movable Ottoman: Includes a movable ottoman to easily create a chaise lounge, L-shaped sectional, or sofa bed setup. This versatile design adapts to your space and works as a multifunctional sofa for relaxing, entertaining, or sleeping
  • No Assembly, Easy Setup: Ships in 5 manageable boxes for convenient delivery. No tools or complicated instructions required—simply unpack and let the foam fully expand within 72 hours. A hassle-free upgrade for any living room

Why Choose the Vesgantti 159" Large Modular Sectional Sofa

The Vesgantti 159" Large Modular Sectional Sofa, L-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with Movable Ottoman, No Assembly Needed, Grey earns repeat purchases through easy-to-assemble construction and modular sectional, both delivering simple assembly.

Best For

The Vesgantti 159" Large Modular Sectional Sofa is best suited for: versatile, lounging, homes with kids.

Quick Summary

The Vesgantti 159" Large Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 21.7 inches. Seat Height: 17.3 Inches. Weight Limit: 1500 Pounds. Price: $874.48.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Seat Depth 21.7 inches
Seat Height 17.3 Inches
Weight Limit 1500 Pounds
Seating Capacity 5
Product Dimensions 79.6"D x 159"W x 32.3"H
Item Weight 46 Pounds
Type Sectional
Color 159" - 4 Seater + Ottoman Grey
Quantity
View full details